Tuesday 22 November 2011

StuG III Ausf.F WIP #2

Today I was parked up for a couple of hours at a collection this afternoon, so some work was done on the StuG III during this time.


The upper part of the hull has been fitted to the lower section, but the hatches have been left off for painting. Also fitted are the air intakes for the engine and the storage boxes on the hull sides. The gun barrel is assembled, but needs to be cleaned up before fitting to the mantle. These will be fitted in place once the hull has been painted. Hopefully I willhave some more time spent on a loading bay tomorrow, so I can get some more work done on it.





No comments:

Post a Comment